Pipe for the intake of the old Trisuli Hydropower Station, at 22MW was the largest project in Nepal when it was completed in 1968. Nuwakot. 2012.
The headworks construction site of the 456MW Upper Tamakoshi Hydropower Project. Lamabagar, Dolakha. 2013.