Nepali workers inspecting the impact drill of machinery being used to construct the 12km access road for the 216MW Upper Trishuli 1 Hydropower Project. Mailung, Rasuwa. 2013
Access Tunnel for the Trishuli 3A Hydropower Project. Simle, Rasuwa. 2013.
A local woman with a developer from Kathmandu at the construction site for the field offices of the 104MW Rasuwaghadi Hydropower Project, being developed by the Chilime Hydropower Company. This village is 2km from the border of Tibet at Rasuwaghadi, and the majority of locals speak Tibetan and hail from Tibet. Ghattekhola, Rasuwa. 2013.