Dalit family living in the 'inundation area' for the pending 650MW Tamakoshi III area. Negyal, Dolakha. 2013.
The headworks of the 60MW Trishuli 3A Hydropower Project, where construction was temporarily stalled due to political and financial disagreements between the Chinese contractor/developer and the Government of Nepal. Salleta, Rasuwa. 2013.
Man fishing in the Trishuli River in an area between the intake and tailrace tunnels of the 60MW Trishuli 3A Project, where flows will be significantly reduced by the diversion dam upstream. If CGGC, the Chinese developer/contractor, receives permission to upgrade the project to 90MW, then this section of the river will be dry during non-monsoon periods. Simle, Rasuwa. 2013.