Local Tamang men working maintenance in the underground powerhouse of the 22.1 Chilime Hydropower Project. Syaphrubesi, Rasuwa. 2013.
Haku, future site of the headworks and intake tunnel of the 216MW Upper Trishului 1 Hydropower Project, which has recently entered the construction phase. The Korean developer-contractor has begun building the 12km access road, project facilities, and a test tunnel below in Mailung - this area is currently roadless. Haku, Rasuwa. 2013.