Powerhouse construction in the main tunnel of the 456 Upper Tamakoshi Hydropower Project. 1.4km underground, near Gonggar, Dolakha. 2013.
The local market settlement near the Trishuli 3A and 3B hydropower project, what used to be the end of the road. Santi Bajaar, Nuwakot. 2013.