Locals passing over the tailrace tunnel for the 60/90MW Trishuli 3A Hydropower Project, where water travelling through the 4km intake tunnel to the subeterranean powerhouse will return to the river . 2013.
Headworks site of the 456MW Upper Tamakoshi Hydropower Project. Lamabagar, Dolakha. 2013.
A settlement of sixteen Newar families along the Tamakoshi River, which will be inundated in the coming years by the peaking reservoir for the 650MW Tamakoshi III Project. These families a descend from common ancestors, and have been living here for six generations. Nag Dahal, Dolakha. 2013.